Progress on the House This Season

I made a fair bit of progress this year on the house.  The first part of the season was taken up by gardening and tending the grapes, so I wasn't able to start working on the house until about June, when I started by finishing the last section of earthen floor.  Last year I wasn't able to finish the section of floor under the batteries below the stairs, so I moved the batteries and finally finished that section.  Finishing this section was key to being able to continue the interior construction of the bathroom, which was to be tucked under the stairs.

Another project I worked on fairly early in the season was doing the fascia and soffit and the shingling on the gable ends.  The scaffold had been set up all winter and I was anxious to get it out of the way so I could see the house.  It was a while before I could move it though.  But I'm really pleased with how everything turned out.  I did this fishscale design with the wooden shakes.  It wasn't that hard to shape each piece of wood and nail it in place, and it added a lot of character to the house.

Saturday, December 11, 2010

Hoop House!

It's finally getting to the end of the working season. We had our first snow yesterday and many days it's too cold to do much outside. I've finished most of what I wanted to finish outside, though I still have a few important tasks to complete, like building a wood shed and putting gutters on the house. For a while there I was worried I wasn't going to be able to finish the hoop house in time to plant in the spring. I've had a number of problems with the kit. There was no information in the instructions about how to build the end walls, so it's been interesting trying to figure out how to do that and how the plastic on the end walls is attached. There seem to be major parts of the instructions that are left up to the person putting it up to figure out for themselves even though parts provided are sometimes not compatible. It's been much more of a struggle than I would have expected from something prefab, but I have now finished it. The plastic is up and it's pretty tight for the winter.

Tuesday, October 5, 2010

Insulation in the attic

As the weather gets colder it seems I'm moving faster to try to get things done in time to move into the new house by winter. I'm shooting for Oct 31st to have it ready to live in and it's still possible I could make it. I just have to finish the earthen floor, get the wood floor laid on the second floor and enclose the east gable end. Once that is done it will be sealed from the cold at least. I may not finish the interior plaster, but I'm not sure I want to since I would like to add some detail to it and I'd like to take the time to make it really aesthetically interesting.


I found this little critter on the trim above the front door of the new house when I was about to lime plaster the wall. I've never seen a frog just sitting relaxing like this. It's a tree frog and probably like a cool spot to rest in. They have suction cup toes. I moved it before plastering.

Wednesday, September 22, 2010

Monarch Butterflies Take Over

I've continued this busy building season working on the house. I'm making progress on the earthen floor. The light clay straw has taken way too long to dry and is setting back the entire project, unfortunately. At least now I know it needs at least a month to dry. I've even resorted to pushing boards underneath the layer of light clay straw to prop it up and allow air flow underneath. This worked but it did loosen the straw somewhat. I couldn't wait any longer for it to dry though.

The monarch butterflies flooded our fields this year to feed on nectar from the white snakeroot. I don't know what was going on with the migration or why they are suddenly in such great numbers this year. I've never seen so many in one place before. All the white flowers in the picture below are white snakeroot and each plant has 5-7 monarchs on it. There have got to be thousands in our fields.


Tuesday, August 10, 2010

Quick Update

So I'm going to try to make this update brief since I feel like blogging takes a lot of time and I don't have extra right now, but I really want to get up some pictures of the changes happening with my projects this season. We'll start with the successes.

The vineyard

All this rain has been great for the vines. They need plenty of water when they are getting established and this season has provided it steadily up until the last couple weeks.

Many of the vines have been growing so fast I was forced to get going on putting up the trellises. They went up just in time and now many of the vines have reached the trellis wire and some have even fully filled out their allotted space on it. I'm hoping that by the end of the season nearly all the vines will have filled in their space so next season they can produce a full crop.


These are locust posts harvested from nearby Sandhill farm. They are an organic rot-resistant alternative to treated posts, and they look a lot more organic too.